SMHV displays Running status wrongly for completed jobs and "_Running.txt" remains
Applies to
SnapManager for Hyper-V (SMHV) 2.1.4
Issue
- SMHV displays
Running
status for the completed jobs
- Text file left over with the suffix
_Running.txt
together with the completed job text file with the suffix_OK.txt
underReport Directory Path
configured in Report Settings
Example:
<backup_name>_[job]-ac_[<job_type>]_05-09-2017_00.59.54_OK.txt
<backup_name>_[job]-ac_[<job_type>]_05-09-2017_00.59.54_Running.txt