Does 7 MTT require rebaselining after a physical relocation of 7-mode or C-mode systems?
Applies to
7-Mode Transition Tool (7MTT)
Answer
If the following points are followed, then there is no need to rebaseline:
- Before relocating the system, pause all the 7MTT jobs and resume them only after the migration is completed.
- The network and disk configurations must be the same before and after the relocation.
- 7MTT must be able to connect to the system both 7-mode and C-mode systems from the new location.