Answer

  • Under normal conditions, upgrading CVO in an HA configuration typically takes approximately 1 hour, but actual duration may vary based on:
    • System load
    • Network conditions
  • Upgrade progress can be monitored through:
    • NetApp Console under Administration Audit
    • ONTAP CLI commandto check upgrade progress:

::>cluster image show-update-progress

Note:

For single-node system, the upgrade process takes the system offline for up to 25 minutes, during which I/O is interrupted.