Skip to main content
NetApp Knowledge Base

FCP initiator sessions fail to reconnect after MetroCluster switchover or switchback

Views:
222
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches
Specialty:
brocade
Last Updated:

Applies to

  • NetApp AFF-A300
  • ONTAP 9.7
  • MetroCluster setup
  • Brocade Fibre Channel (FC) SAN switches

Issue

  • After performing MetroCluster switchover or switchback, FCP sessions of host initiators are not established although initiators are reachable from the LIFs
  • Initiator sessions are reestablished after disabling and reenabling zoning on the Brocade switches

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device