Skip to main content

Exciting new changes are coming to the Knowledge Base site soon!
Starting April 4, 2023, you will notice Support-Specific categorization and improvements to the search filters on the site. In May, we will be launching a new and enhanced Site UI and Navigation. To know more, read our Knowledge Article.

NetApp Knowledge Base

Cluster switch ISL down after switch power cycle

Views:
859
Visibility:
Public
Votes:
1
Category:
fabric-interconnect-and-management-switches
Specialty:
hw
Last Updated:

Applies to

CN1610 cluster network switch

Issue

  • After power cycle of a switch, filers reporting ISL down

The cable used to connect switch "CN1610-1/ Link Aggregate 1" to the ISL port might be faulty. For port-channel, please check each individual link.
The cable used to connect switch "CN1610-1/Slot: 0 Port: 13 10G - Level" to the ISL port might be faulty. For port-channel, please check each individual link.
The cable used to connect switch "CN1610-1/Slot: 0 Port: 14 10G - Level" to the ISL port might be faulty. For port-channel, please check each individual link.
The cable used to connect switch "CN1610-1/Slot: 0 Port: 15 10G - Level" to the ISL port might be faulty. For port-channel, please check each individual link.
The cable used to connect switch "CN1610-1/Slot: 0 Port: 16 10G - Level" to the ISL port might be faulty. For port-channel, please check each individual link.
The cable used to connect switch "CN1610-2/ Link Aggregate 1" to the ISL port might be faulty. For port-channel, please check each individual link.

 

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device