Skip to main content
NetApp Knowledge Base

Node down and partner node triggers PSU critical error

Views:
123
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
hw
Last Updated:

Applies to

  • FAS8200
  • ONTAP 9
  • SP Firmware 5.10

Issue

  • Node panic and SP can't be accessed.
  • Partner node triggers the following PSU errors.

HA Group Notification (Health Monitor process cphm: CriticalFruMultiFaultAlert[PSQ0A2184600020]) ALERT
HA Group Notification (CHASSIS POWER SUPPLY DEGRADED: PS 1) ERROR
HA Group Notification (CHASSIS POWER DEGRADED: Power Supply Status Critical: PSU1, PSU2.) ERROR

  • On partner node PSU1 and PSU2 shows BAD status from sp-latest-ipmi

sp-latest-ipmi:
/usr/local/bin/environ -show_all
================================
Sensor Name State Current Critical Warning Warning Critical
                  Reading Low      Low     High    High
-------------------------------------------------------------------------------------------------
PSU2 Bad          TRUE
PSU1 Bad          TRUE
PSU2 need         replacement NO
PSU1need replacement NO
PSU2              BAD
PSU1              BAD

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device

 

  • Was this article helpful?