How to power off an E-Series storage system

Views:
2,955
Visibility:
Public
Votes:
1
Category:
e-series-systems
Specialty:
esg
Last Updated:

 

Applies to

All E-Series platforms

Description

This article describes how to power off and on an E-Series array.


Examples:
When moving the system to a new location, data center upgrades, hardware replacement, or upgrades.

 

Procedure

Perform the following steps:

Powering Down
  1. Halt the Host I/O.
  2. Perform any additional steps required on the host, such as unmounting file systems.
  3. Wait for 5 minutes.
  4. Ensure there are no background operations in progress
    • SANtricity Storage Manager: Monitor > Reports > Operations in Progress
    • SANtricity System Manager: Home tab > View Operations in Progress
  5. Turn off both power supplies in the controller-drive enclosure.
  6. Wait for the LEDs to go dark.
  7. Turn off both power supplies in each Expansion enclosure.
  8. Wait for 2 minutes for the drives to spin down.

At this point, disconnect the cables and start moving/removing hardware, or perform any FRU activities.

Powering Up
  1. Power on all Expansion enclosures.
  2. Wait for 2 minutes to allow the drives to spin up.
  3. Power up the controller-drive enclosure.
  4. Wait for 3 minutes.
  5. Reconnect the cables, if required.
  6. Resume the host activity.

 

CUSTOMER EXCLUSIVE CONTENT

Registered NetApp customers get unlimited access to our dynamic Knowledge Base.

New authoritative content is published and updated each day by our team of experts.

Current Customer or Partner?

Sign In for unlimited access

New to NetApp?

Learn more about our award-winning Support