Issue
When the Takeover / Giveback test was performed 5 times, the LIF did not migrate and I/O was stopped at the 5th time.
NetApp wins prestigious Coveo Relevance Pinnacle Award. Learn more!
INSIGHT Japan :2023年 1月25日(水)ANAインターコンチネンタルホテル開催 へ参加・申込を行う
When the Takeover / Giveback test was performed 5 times, the LIF did not migrate and I/O was stopped at the 5th time.