Skip to main content
NetApp Knowledge Base

Not able to perform switchback during headswap procedure

Views:
163
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • two-node MetroCluster head upgrade
  • From AFF8040 to AFF300
  • switchover state

Issue

During upgrade of the first node not able to perform metrocluster switcback

Failed to validate the node and cluster components before the switchback operation.
(non-overridable veto): The DR partner is not ready for the switchback

MetroCluster node show reports new node in normal state instead of waiting for switchback

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device

 

  • Was this article helpful?