Skip to main content

NetApp wins prestigious Coveo Relevance Pinnacle Award. Learn more!

INSIGHT Japan :2023年 1月25日(水)ANAインターコンチネンタルホテル開催 へ参加・申込を行う

NetApp Knowledge Base

LUN connectivity lost during upgrade of ONTAP to 9.9.1

Views:
281
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • ONTAP 9.9.1
  • 2-node MetroCluster

Issue

  • After performing switchover/switchback during ONTAP upgrade LUN connectivity is lost.
  • On the sync-destination vserver, missing igroups and lun mappings are identified by running ONTAP CLI commands igroup show or lun show.
  • LUN connectivity is restored after the final switchback.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device