Skip to main content
NetApp Knowledge Base

IO stop / long CPs during ATTO bridge upgrade

Views:
220
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

Applies to

  • Metrocluster
  • ATTO 7500N 2.96+
  • ONTAP 9.5+

Issue

  • Upgrading an ATTO bridge 7500N via in-band leads to IO stop or long CPs reported
  • Disk utilization might go to 100%

 

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device

 

  • Was this article helpful?