Skip to main content

NetApp_Insight_2020.png 

NetApp Knowledgebase

OnCommand Unified Manager events "Node To FC Switch All FC-Initiator Links Down" and "Node To FC Switch All FC-VI Interconnect Links Down"

Views:
97
Visibility:
Public
Votes:
0
Category:
oncommand-unified-manager
Specialty:
om
Last Updated:

Applies to

  • OnCommand Unified Manager 7.2+
  • OnCommand Unified Manager 6.x
  • OnCommand Unified Manager 6.0 and later
  • ONTAP 8.3 and later in MetroCluster configuration

Issue

Certain MetroCluster Cluster (MCC) events in OnCommand Unified Manager (UM) are not becoming obsolete after the MCC is brought back into a stable configuration.
The events include but may not be limited to the following:

  • Node To FC Switch All FC-Initiator Links Down
  • Node To FC Switch All FC-VI Interconnect Links Down

New instances of these may be created after marking events as resolved but the associated condition is not observed or has already been fixed on the clusters and MetroCluster fabric devices.

 

CUSTOMER EXCLUSIVE CONTENT

Registered NetApp customers get unlimited access to our dynamic Knowledge Base.

New authoritative content is published and updated each day by our team of experts.

Current Customer or Partner?

Sign In for unlimited access

New to NetApp?

Learn more about our award-winning Support